top of page

Location:

Dallas, TX

Completion Date:

August 2020

Size:

1,050 SF

Components:

Logistics Building, Dumpster Catwalks, AHU Access, Loading Dock

Project Type:

Healthcare

Parkland Hospital System

THR3E Design used laser to scan the existing interior loading dock space and developed an all-aluminum structure that provided access to all required filter and clean-out access points, without modifying any existing ductwork. The A/E team developed a unique solution that met the goals and could be installed without interrupting hospital services.

bottom of page